by wpadmin | 2021 Mar 14 | Egyéb kategória
Follow the construction process! 2021.03.14. In order to design the stability of the structures and to select the base bodies to be used, it is necessary to drill the test boreholes. 5 large diameter boreholes of 6-8 m depth and 4 static CPT probes of 12-14 m...
by wpadmin | 2021 Mar 8 | Egyéb kategória
Follow the construction process! 2021.03.08. Taking into account the characteristics of the site, and in particular the need to preserve the integrity of the existing environment, we started with the initial sketches and worked our way through the finalised...