Deep foundation has started

Deep foundation has started

Follow the construction process!  2021.11.16. Our construction continues with the deep foundations.The first step is to excavate the valuable humus layer from underneath the area of the houses, which will be used for the gardening work later on. The humus layer was...
Soil mechanics drilling has started

Soil mechanics drilling has started

Follow the construction process!  2021.03.14. In order to design the stability of the structures and to select the base bodies to be used, it is necessary to drill the test boreholes. 5 large diameter boreholes of 6-8 m depth and 4 static CPT probes of 12-14 m...