Soil mechanics drilling has started

Follow the construction process!

2021.03.14.
In order to design the stability of the structures and to select the base bodies to be used, it is necessary to drill the test boreholes.

5 large diameter boreholes of 6-8 m depth and 4 static CPT probes of 12-14 m depth will be completed this week.

The soil samples obtained will be evaluated in the laboratory and used as input data for the design of the supporting structures.

Drilling begins
We also have the soil sample

Work was continued with CPT probing

2021.03.24.

CPT probing
CPT probing